军营里娇喘呻吟声H,5D肉蒲团之性战奶水又爽又黄,中文字幕无码亚洲字幕成A人蜜桃,激情无码人妻又粗又大

您好!歡迎訪問(wèn)蚌埠三合電子科技有限公司網(wǎng)站!
全國(guó)服務(wù)咨詢熱線:

18895606220

當(dāng)前位置:首頁(yè) > 技術(shù)文章 > 外貿(mào)地磅參數(shù)配置及安裝步驟

外貿(mào)地磅參數(shù)配置及安裝步驟

更新時(shí)間:2016-08-21      點(diǎn)擊次數(shù):2993

一、技術(shù)參數(shù):

1、操作工況及技術(shù)條件

1.1 環(huán)境氣溫:-30℃~+65℃

1.2 稱(chēng)重對(duì)象:車(chē)載特資

1.3 秤體 3X14M

額定稱(chēng)重:50T\允許軸載30T

精度等:III

刻度20kg

臺(tái)面尺寸: 3m×14m   秤臺(tái)面板厚度:12mm

安全過(guò)載:150%F·S

承重臺(tái)超載:200%

結(jié)構(gòu)形式(稱(chēng)體):U型鋼,箱式密封結(jié)構(gòu),模塊4節(jié)臺(tái)面式,臺(tái)面板厚度10MM,秤臺(tái)表里刷二道防銹底漆,表面噴灰色面漆。

穩(wěn)定時(shí)間:5秒

1.4 防爆傳感器 SQC-30T(橋式)

額定荷載30T;精度:0.02%(即0.02)

安全過(guò)載:150%F.S,極限過(guò)載:300%F.S

數(shù)量及選型:1臺(tái)

防護(hù)等:IP67

1.5 稱(chēng)重信號(hào)處理系統(tǒng):

1.6 此套配置為我公司結(jié)合自向十年電子衡器制造經(jīng)驗(yàn)和中外先進(jìn)半導(dǎo)體技術(shù)的結(jié)晶。

1)重量顯示:冷色數(shù)碼顯示與超大LED顯示,(附加配置)即一臺(tái)秤有兩處同時(shí)顯示稱(chēng)重?cái)?shù)據(jù),使用方便而又有保障。

2)有完整的自檢功能和強(qiáng)大的稱(chēng)重信息管理功能。

3)非線性+0.01%OF FULL SCALL

4)靈敏度0.8ч V/D溫度系數(shù)  +0.0005%/℃

5)電腦鍵盤(pán)式操作鍵

6)電源220VAC 50HZ

7)功能:

◆*的皮重功能:

手動(dòng)皮重資料輸入

線上皮重資料查詢

200筆皮重資料記憶

◆萬(wàn)年歷(時(shí)鐘功能):

可顯示年/月/日、時(shí)/分/秒,自動(dòng)閏年、閏月

精度:+ 5s/24h,不受斷電影響

◆顯示:

稱(chēng)重儀表顯示:七位冷色數(shù)碼管顯示、狀態(tài)符指示(零點(diǎn)、不穩(wěn)定偵測(cè)、毛重、凈重、皮重輸入、電源) 

資料處理器顯示:背光彩色型液晶顯示屏、中文畫(huà)面顯示

◆大屏幕顯示和進(jìn)入電腦管理的接口設(shè)置

◆提供多種磅單格式:?jiǎn)螐埲?lián)式、非碳復(fù)寫(xiě)式

1.7接線盒:專(zhuān)業(yè)穩(wěn)固型設(shè)計(jì),采用柔性橡膠密封、5PPM(百成分之五/℃)溫度系數(shù)

1.8精密電阻、防水接頭

1.9穩(wěn)壓電源:SANTAK UPSK500

2、安裝條件:

2.1 秤體為露天安裝,其他按供方要求

2.2 電壓220VAC (-15%~+10%,50Hz)

1. Check all goods against list, pay attention to the steel-seal letter A1、A2、A3、A4、A5、A6、A7、  A8、A9、A10、A11、A12 on the surface of the scale-bodies, load cells, tools wooden cases and   indicator (See the following figure).Be ready to install   A2 A4 A6 A8 A10 A12   A1 A3 A5 A7 A9 A11

2. Scale-body assembling:   Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane   (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling   off), attention to the marking.the marking of A1、A3 with the marking of A2、A4 of the scale-body, the   marking of A5、A7 with the marking of A6、A8 of the scale-body , the marking of A9、A11 with the   marking of A10、A12 of the scale-body, then tighten the scale-bodies with 96 sets of M20X60   socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm   lever. Each pair of bolts including 2 washer, 1 spring washer and 1 thickening nut. See the following   figure:  

3. Installing load cell  Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring  washer.    (Note: The marking on the load cell and scale-body should be consistent.)   Note:a. Install the load cell directly on the back of the markings A1、A2、A11、A12 of the scale-bodies.   b. Install the load cell on connecting-plate of the scale-bodies markings A3、A4、A7、A8 of the  scale-bodies.

4. Place the scale-body into the completed pit

4.1 Fix up one end of the four steel cable in the same length into the installation hole on the  scale-body which marked A1、A2、A3、A4 using the shackle, the other end of the steel cable should   cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel   cable should not less than 45°.   

4.2 Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate   between the scale-body and the walls of the foundation pit to guarantee the scale-body into center   place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position   scale-body into the foundation .See the following figure:   Thicken Wood  

4.3 Install the second-section scale-body which marked A5、A6、A7、A8, ensure the marking   A5、A6 of the second-section scale-body should be corresponding with the marking A3、A4 of   the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the   position of the joint. make sure the joint hole of joint should be corresponding with the connect   forelock of the first section scale-body. attention to adjusting the clearance about 5~6mm   between the two sections of scale-bodies. The clearance around the scale-body is roundly the   same. See the following figure:

4.4 Lift and install the third-section scale-body(which marked A9、A10、A11、A12),ensure the   marking A9、A 10 of the third-section scale-body should be corresponding with the marking A7、A8   of the second-section scale-body. The installation step the same as the first and second section   scale-body.

5. Adjust the scale-body after placing is finished.

5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up   in that position with the jack and put the level-adjusting plate under the installation plate for load cell   to make sure the steel-ball can't be rotated.   5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there   is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order   to avoid weighing accurate is not good from big rocking when the truck drives on the scale.

6. Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the  passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal   cable to the junction box. (Attention to the marking on load cell and junction box should be consistent),   then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side   cover-plate of the scale-body.

7. Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other  end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell   short-connection, it will protects the load cell from damage by lightning when they are working.   ground-cable  

8. Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body  with 24 sets of M10×25 stainless steel common bolts. attention to the marking on the side-cover plate   and the scale-body should be consistent.  

9. Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35  common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment)  

10. Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

11. The installation is finished.

蚌埠三合電子科技有限公司
地址:安徽省蚌埠市蚌山區(qū)聚云商務(wù)廣場(chǎng)1號(hào)樓722室
郵箱:623226630@qq.com
傳真:86-0552-3073177-808
關(guān)注我們
歡迎您關(guān)注我們的微信公眾號(hào)了解更多信息:
歡迎您關(guān)注我們的微信公眾號(hào)
了解更多信息
国产午夜精品一区二区| 18禁黄网站禁片免费观看久久| 日本肥熟妇搡bbbb搡bbbb| 男人的又粗又长又硬有办法吗| 中文乱码人妻系列一区二区| 无套中出丰满人妻无码| 国产99久久久国产精品潘金莲| 欧美人与鲁交大毛片免费| 三A级做爰片免费观看| 无码少妇精品一区二区免费动态| 国产午夜精品一区二区三区漫画 | 久久久久亚洲AV无码专区电影 | 精品无码人妻一区二区三区| 国产GV天堂亚洲国产GV刚刚碰| 国产69久久精品成人看| 亚洲精品久久国产高清| 日日躁夜夜躁狠狠躁| 国产69精品久久久久人妻| 亚洲日韩精品一区二区三区无码| 出差被夫の上司持久侵犯三浦步美| 羞羞漫画网页入口| 学生小嫩嫩馒头在线观看| 最近日本MV字幕免费观看| 人妻妺妺窝人体色WWW聚色窝| AV高潮喷水一区二区三区| 国产97色在线 | 国产| 国产精品毛片大码女人| av天堂午夜精品蜜臀av| 熟女性饥渴一区二区三区| AV人摸人人人澡人人超碰下载| 免费雷电将军乳液VX网站| 国产精品VA在线播放我和闺蜜| 精品久久久久久久无码人妻热| 丰满人妻熟女色情A片| 顶级少妇倣爱A片XXX| 日韩性做爰免费A片AA片| 欧美大片VA欧美在线播放 | 国产精品无码MV在线观看| 国自产拍偷拍精品啪啪模特 | 无码人妻精品一区二区三区在线| 综合久久|